Customer: Pacific Lutheran University

Job Name: Columbia Center Steam Boiler Replacement

Date Installed/Started:  January 3, 2014

PLU Columbial Center Series 300Hurley Engineering Company was asked to evaluate and propose a replacement steam boiler serving the kitchen cooking appliances for the Columbia Center at PLU.  The existing Cleaver Brooks Boiler was over 25 years old and had some failing components that were obsolete and expensive to replace.  Not only were parts unavailable, the existing capacity had changed over the years making the existing boiler oversized and inefficient for the application.

We proposed a Triad Series 300 Vertical Steel Firetube low pressure steam boiler sized at up to 345lbs/hr to match the current steam requirements.   The new Triad Boiler was installed during the winter break while the kitchen equipment was not being used.

TRIAD BOILERS - LOGO

Triad Boiler Systems offers a complete line of hot water and steam boilers that will fit most any application.  Please contact Hurley Engineering Company to provide a complete system evaluation for your mechanical equipment needs.

 


 

The VUE Apartments

The VueLocated in the heart of Portland’s Cultural District, Vue apartments is in close proximity to the Portland Art Museum, Oregon Historical Society, Keller Auditorium and much more. Located at the center of the Park Blocks and walking distance to Portland State University. Views range from the west hills, to the beautiful Park Blocks, Portland’s amazing skyline and OHSU. Just steps from the Streetcar, Starbucks, Subway, Rogue Brewery Restaurant, and the Portland Farmer’s Market.

Riverstone property management had a problem with its prime property The VUE apartments, its 16 story apartment complex domestic water pressure boosting system was old and antiquated . Its constant speed 40HP base mounted pumps ran constantly 24 hours a day with a thermal water purge when the pumps began to get hot. Water was wasted by the hundreds of gallons each day. In addition Riverstone Management saw that their energy costs were not going to get any cheaper. Something had to be done.

Portland Mechanical the installing Mechanical contractor saw the solution. Upgrade this antiquated booster system with a Grundfos BoosterPAQ Triplex Booster system. It was a perfect fit. The mechanical room was down deep in the basement of the building. The contractor because of the BoosterPAQ ‘s footprint was able to easily move the system into place.

In addition the Vue Apartments had an existing 1000 gallon compression tank the BoosterPAQ could pressurize.  

Jim Bailey the resident maintenance superintendent was quoted as saying “ I have observed on many morning occasions during peak load hours that the BosterPAQ will come on only for a few minutes every 15 minutes or so then shut off, that is money and water being saved, management and I could be happier”

 


 

Portland Towers

pksystemHarsch Investment properties needed help. The old steel firebox hot water heating boilers were falling apart and inefficient and were replaced by another competitors condensing boiler.

But unfortunately the condensing boilers only lasted a few years.  TCM Temp Control Mechanical extremely disappointed in the quality of these boilers turned to Hurley Engineering for help.

Hurley Engineering suggested two new Patterson Kelly Stainless Steel Sonic SC-3000 condensing boilers for the job. The size, shape, pressure rating and configuration was perfect for the project and  was going to suit the calculated heating load for the building ,its footprint clearances were perfect for the project.

The retrofit in the boiler room was fairly simple with a primary secondary design being implemented  with each apartment is served by its own convection radiators.

TCM Temp Control Mechanical is excited to be using Patterson Kelly for the project and are looking forward to using more Patterson Kelly on other projects in the future.